Mold making tool shop

FAQ

1, How long do you need to quote?

Normally within 24 hours for 1~3 molds or parts

2, What do you need for a quote?

Part 2D or 3D drawings with details specifications like mold cavities, steel material, raw material etc. 

3, How can we make sure our patent  information is well protected, can you signed  NDA.

Yeah, sure. We can signed NDA.

4, How long do we need for production?

—-Machining parts 1~4 weeks based on the surface treatment and design.

—-Mold making 4~8 weeks

—– Molding   2~5 weeks 

5, How we can know project status by thousands miles distance?
 
 —-We have one to one project mananger to send you weekly report every weeks.
 
6, What is the life guarantee for molds? Can you suggest mold steel?
 
—-Normally for prototype molds with 10K shot, we suggest S50C, 1.1730 or equal.
 
—-For mold 300K~500K shots mold life, we use P20, 738H, 1.2312 etc…
 
—-For 800K~1 million shots mold life, we use H13, 1.2343, 1.2344, S136,       More over high production over 1 million shot, we use Stainless.
 
7, What material do you usally use for machining parts?
 
Plastic material like POM, PC, PMMA, Nylon, Tecaform, PEEK, PE, PVC, ABS, PET,
 
Metal mterial like steel PD613, Mild steel(1.0402),D2(1.2379), G04,1,2329,1.1730,1.6565, 1.0511, 1.2510,1.2344,H13, 1.2826, P20,1.2316 etc, Aluminium(6082,6061,6063…),  Stainless S303, S304, Brozon,Copper, Grand flat stock, Stavax, UHMWPE.
 
8, How is the processing for order from you?
 
For mold
NDA—RFQ—Technical confirm—PO—2D&3D—Machining with weekly report—Mold fitting—Mold trial till mold confirm(Trial report, molding parameter, FAI dimension report, video, picture)—Shipment
 
For Machining
NDA—RFQ—Technical confirm—PO—Machining with weekly report—Assembly if needed—Part FAI report and part picture to customer confirm—Shipping